Open Modal

Hawaiian Electric to Conduct Aerial Line Inspections

Hawaiian Electric will conduct quarterly aerial inspections of its major overhead transmission lines from Monday, April 4, to Thursday, April 7, 2022.

The islandwide inspections which are scheduled to take place from 7:30 a.m. to 4:00 p.m. are designed to improve system reliability.  Exact times and routes will depend on weather conditions. Inspections will be conducted in a Manuiwa Airways helicopter and require the aircraft to fly low and slow which may cause some noise disturbances.

Residents can call 969-6666 with any questions or concerns.

Recommended Posts

Loading...